At a glance

Type
aircraft developer
Status
development
Headquarters
Dania Beach, Florida, United States
Last verified
2026-11

Overview

Doroni Aerospace is a US developer of personal electric vertical take-off and landing (eVTOL) aircraft, based in Dania Beach, Florida. Doron Merdinger founded the company and is its chief executive. The company website gives 2017 as the founding year; the company's X profile gives 2016. Doroni built a series of prototypes (Y, X and H1). The H1 prototype was completed in January 2023, and the company says it made its first crewed flight in March 2024 under an FAA special airworthiness certificate. Doroni says its prototypes have completed more than 70 test flights.

Aircraft

The H1-X is a two-seat personal eVTOL. It is designed to be kept in a residential garage and to take off from a driveway. According to the manufacturer, it has:

  • a tandem-wing layout with fully enclosed ducted fans: eight for vertical lift and two for horizontal thrust
  • a carbon-fibre airframe and a whole-airframe ballistic parachute
  • a target top speed of 193 km/h (120 mph) and a reported cruise speed of about 153 km/h (95 mph)
  • a target point-to-point range of 161 km (100 miles); earlier company materials cited about 97 km (60 miles)
  • 25-minute fast charging

Aviation Week describes the configuration differently, as four ducted lift fans and two pusher thrusters. The aircraft will include Doroni's SOUL AI digital co-pilot. All performance figures are company targets; maximum take-off weight has not been published.

Status

  • March 2026: Doroni unveiled a full-scale H1-X engineering model at its "Soul of the Sky" event on 26 March.
  • August 2026: SES AI signed a framework agreement to design and develop the H1-X battery pack. It is worth up to US$1.09m, of which US$65k is committed, and testing is planned from 2027.
  • September 2026: It announced a partnership with Seattle-based TLG Aerospace covering structural loads, aerodynamics (CFD), finite element analysis (FEA), flight mechanics and certification data. The aim is FAA light-sport aircraft certification under the MOSAIC rule.
  • November 2026: Doroni reported raising more than US$60 million from over 20,000 investors through crowdfunding rounds. This is a company figure. Its Reg A filing for the first half of 2026 shows US$21.65 million net raised in that period, US$13.42 million cash at 30 June 2026 and about US$330,000 in customer deposits.

The company's stated plan is to finish H1-X engineering in 2026, fly the aircraft in the second half of 2027 and begin deliveries in 2028. Its filings tie the late-2027 FAA submission to financing. No H1-X approval has been granted. The earlier H1 prototype's experimental certificate does not apply to the H1-X.

Asia and Sri Lanka

In February 2025, Saudi-based Innovation Wings Industries (operating as Kingdom Aero Industries) agreed a US$30 million strategic investment in Doroni. When the deal is complete, KAI is to hold a 40% stake. The agreement included plans for a joint venture to manufacture the H1-X in Saudi Arabia from 2027. Doroni also signed a tripartite MOU with KAI and Saudi Arabia's National Industrial Development Center, and Flying Magazine reports an MOU for up to US$150 million more. No 2026 confirmation that the joint venture has been set up was found. No activity in South Asia or Sri Lanka has been found. The H1-X is aimed at private owners rather than air-taxi operations.

Milestones

  • Jan 2023: H1 prototype built
  • Mar 2024: First crewed test flight of the H1 prototype, flown under an FAA special airworthiness certificate
  • Feb 2025: US$30m strategic investment agreed with Saudi-based Innovation Wings Industries (Kingdom Aero Industries), including a planned joint venture to manufacture the H1-X in Saudi Arabia; tripartite MOU with KAI and Saudi Arabia's National Industrial Development Center, plus an MOU for up to US$150m more
  • Mar 2026: Full-scale H1-X engineering model and SOUL AI co-pilot unveiled at the Soul of the Sky event in Dania Beach, Florida (26 March)
  • Aug 2026: Framework agreement with SES AI to design and develop the H1-X battery pack (up to US$1.09m; US$65k committed)
  • Sep 2026: Engineering and certification partnership with TLG Aerospace (Seattle) announced, aimed at MOSAIC certification
  • Nov 2026: Reported raising more than US$60m from over 20,000 investors (company figure); H1-X flight testing targeted for the second half of 2027