At a glance
- Type
- aircraft developer
- Status
- certification in progress
- Headquarters
- Manassas, Virginia, USA
- Last verified
- 2026-11
Overview
Electra.aero (Electra) is a US aerospace company based in Manassas, Virginia. It is developing hybrid-electric aircraft that take off and land in very short distances. Electra calls the category "Ultra Short" and markets it under the name "Direct Aviation". Marc Allen is chief executive. Electra is not an eVTOL developer: its aircraft are fixed-wing aeroplanes that use blown lift rather than vertical take-off.
Aircraft
The EL9 Ultra Short carries nine passengers. Eight electric motors along the wing blow air over large flaps to create lift at low speed. The motors are powered by four battery packs and a small turbogenerator, which recharges the batteries in flight, so no ground charging infrastructure is needed. Safran is developing and producing the TG600 turbogenerator under a life-of-programme agreement.
Manufacturer figures: - take-off and landing in 150 ft (about 45 m) - cruise speed of 175 knots (about 324 km/h) - about 611 km (330 nm) with nine passengers and baggage, or 1,361 kg (3,000 lb) of cargo - maximum ferry range of 1,100 nm (about 2,037 km) with IFR reserves
The aircraft is to be certified for IFR flight and flight into known icing. It has two crew stations but is designed for single-pilot operation.
The two-seat EL2 Goldfinch demonstrator has been used to test the technology. In 2026 it flew a series of urban demonstrations: - May: from a pier at Columbus Street Terminal in downtown Charleston, South Carolina - August: from Philadelphia's Tioga Marine Terminal to North Philadelphia Airport, as part of Pennsylvania's FAA eIPP project - 26 October: take-off and landing at the Downtown Skyport heliport in Lower Manhattan
Status
- Certification: Electra applied for FAA Part 23 type certification in November 2025. The FAA closed the G-1 issue paper in July 2026, which sets the certification basis but is not type certification. Work is now in the G-2 (means of compliance) phase.
- Timeline: Electra plans to begin EL9 flight testing in 2027 and is targeting FAA certification in 2029. Some reports put the start of commercial flights in 2030.
- Production: In July 2026 Electra chose Springfield, Ohio, for its first production facility. In September 2026 it signed an agreement with Atlas to build EL9 airframes for flight test and certification.
- Infrastructure: In November 2026 Electra signed an MoU with VertiPorts by Atlantic, a subsidiary of Atlantic Aviation, to assess how new and existing vertiports in New York City could take EL9 operations.
- Orders: Launch operator Bristow paid deposits on five aircraft in January 2026. Electra reported 2,200 pre-orders in March 2025.
- Defence: In November 2026 Electra Defense received a US$4.7 million US Air Force Research Laboratory contract for ground testing and acoustic (battery-only) flight testing of the EL9. The contract builds on a 2023 AFRL STRATFI award worth up to US$85 million.
Asia and Sri Lanka
Electra's Asian activity found so far is in India. Its pre-order customers include JetSetGo, Blade India and Global Vectra Helicorp. Hunch Mobility, which trades as Blade India, signed an MoU in January 2025 to use the EL9 on future regional routes in India.
No Sri Lankan agreement or operation was found. Because the EL9 needs a short ground roll rather than vertical take-off, it would need a different kind of site from eVTOL types.
Milestones
- Nov 2025: Applied for FAA Part 23 type certification for the EL9
- Jan 2026: Bristow paid pre-delivery deposits for five EL9s, securing the first delivery slot, with options for 45 more
- May 2026: EL2 made Electra's first urban demonstration flight, from a pier at Columbus Street Terminal in Charleston, South Carolina
- Jul 2026: FAA closed the EL9 G-1 issue paper, setting the certification basis
- Jul 2026: Chose Springfield, Ohio, for its first EL9 production facility (planned investment of US$850 million)
- Aug 2026: EL2 flew from Philadelphia's Tioga Marine Terminal to North Philadelphia Airport as part of Pennsylvania's FAA eIPP project
- Sep 2026: Signed an agreement with Atlas to build EL9 airframes for flight test and certification
- Oct 2026: EL2 took off and landed at Downtown Skyport heliport in Lower Manhattan
- Nov 2026: Signed an MoU with VertiPorts by Atlantic (Atlantic Aviation) to assess vertiport infrastructure for EL9 operations in New York City
- Nov 2026: Electra Defense won a US$4.7 million AFRL contract for ground and acoustic flight testing of the EL9