At a glance
- Type
- aircraft developer
- Status
- flight testing
- Headquarters
- Melbourne, Florida, USA (corporate press-release dateline); flight testing at Embraer's Gavião Peixoto facility, Brazil
- Last verified
- 2026-11
Overview
Eve Air Mobility was founded in October 2020 as an Embraer company. It is developing an electric vertical take-off and landing (eVTOL) air taxi, a services and support network, and Vector, an urban air traffic management system. Eve Holding is listed on the NYSE (EVEX) and on Brazil's B3 exchange (EVEB31). Eve says Embraer's experience in designing, certifying and manufacturing aircraft supports the programme.
Aircraft
The Eve eVTOL, also called the Eve 100, uses a lift-plus-cruise layout. Eight fixed-pitch rotors provide vertical lift and a single pusher propeller provides cruise thrust, with Embraer's fifth-generation fly-by-wire controls. Eve's figures for entry into service are four passengers plus a pilot and a range of 100 km. It says a future autonomous version could carry up to six passengers. Eve has not confirmed the cruise speed or maximum take-off weight.
Status
The uncrewed full-scale engineering prototype made its first hover flight at Embraer's Gavião Peixoto test site on 19 December 2025. Eve finished the hover and low-speed test block in May 2026 after 59 flights. At the same time, it moved its target for type certification and entry into service from 2027 to 2028. Brazil's civil aviation agency, ANAC, is the main certifying authority, and Eve is also working with the FAA and EASA. In July 2026, ANAC published proposed noise certification criteria for the Eve 100.
Transition flight testing began in July 2026. On 3 August 2026, Eve announced the first partial transition flight, the first time the pusher propeller ran in flight; the prototype reached about 30 knots. By October, partial transition had reached about 45 knots. In its Q3 2026 results (November 2026), Eve reported:
- 73 flights so far, totalling about 3 hours
- the partial transition phase completed
- 170 of 185 planned test points validated
- 8–10 flights left before a full wing-borne transition, expected at about 100 knots and planned before the end of 2026
- a net loss of US$58 million for the quarter
- total liquidity of US$471 million, which management says is enough to fund operations through 2028
Eve plans to build six conforming prototypes for a certification flight-test campaign starting in 2027. Fuselage components for the first conforming prototype have started to arrive. In November 2026, FlyBIS signed a binding agreement for up to 12 aircraft (2 firm orders plus 10 purchase rights) for Southern Brazil. Eve is pre-revenue and has no aircraft in commercial service.
Asia and Sri Lanka
- Japan: In February 2026, AirX signed a binding order for up to 50 aircraft: 2 firm plus options for 48 more. It was Eve's first agreement in Asia-Pacific. The first two aircraft are due in 2029, for use in Tokyo and Osaka.
- Thailand: In August 2026, Eve signed an MOU with RV Connex to help develop Thailand's regulatory framework for advanced air mobility.
- India: BLADE India signed a non-binding agreement for up to 200 aircraft in 2022. Eve announced work with Hunch Mobility on Bangalore flights in November 2023, and agreed with JetSetGo in January 2025 to explore its Vector air traffic management software.
No direct Sri Lanka link has been found. Sri Lanka's current eVTOL programme involves EHang.
Milestones
- May 2022: Eve Holding listed on the NYSE (EVEX)
- Dec 2025: First hover flight of the uncrewed full-scale prototype at Gavião Peixoto, Brazil
- May 2026: Hover/low-speed test block completed (59 flights); ANAC certification and entry-into-service target moved from 2027 to 2028
- Jul 2026: Transition flight-test phase began; ANAC published proposed noise certification criteria for the Eve 100
- Aug 2026: First partial transition flight with the pusher propeller engaged announced (3 Aug)
- Oct 2026: Partial transition reached about 45 knots
- Nov 2026: FlyBIS binding agreement for up to 12 eVTOLs (2 firm orders plus 10 purchase rights) for Southern Brazil
- Nov 2026: Q3 results reported 73 flights, 170 of 185 test points validated and US$471 million in total liquidity