Overview
Eve Air Mobility (NYSE: EVEX; B3: EVEB31) is the Embraer-backed company developing the Eve 100 electric vertical take-off and landing (eVTOL) aircraft. It also offers services and support for operators and Eve Vector, an urban air traffic management system. Embraer engineers do most of the development work, and the eVTOL is flight-tested at Embraer's Gavião Peixoto facility in São Paulo state. In January 2026 Eve raised US$150 million in debt financing, which the company said took its total funding to US$1.2 billion. At the end of Q3 2026 it reported about US$470 million in total liquidity, which it said would fund operations through 2028. The quarter's net loss was about US$58 million.
Aircraft
The Eve 100 uses a lift + cruise layout. Eight fixed-pitch lifter rotors provide vertical lift and a rear pusher propeller provides forward thrust, while fixed wings carry the aircraft in cruise. It uses Embraer's fifth-generation fly-by-wire controls. This profile does not list seating, range or cruise speed because those figures could not be confirmed from a manufacturer or regulator source for this edition.
Status
The uncrewed full-scale engineering prototype first flew on 19 December 2025. The hover and low-speed test block was completed in May 2026, and at that point Eve moved its type certification and entry-into-service target from 2027 to 2028. Transition flight testing began in July 2026. On 3 August Eve announced the first partial transition flight, with the pusher engaged. At its Q3 2026 results in November 2026, Eve reported:
- 73 flights flown
- 170 of 185 engineering test points validated
- partial transition reached at up to 45 knots
Eve said it was eight to ten flights away from full wingborne transition at about 100 knots, which it planned to achieve before the end of 2026.
Brazil's civil aviation agency ANAC is the primary certifying authority. Eve applied to ANAC in 2022, and ANAC published the first airworthiness criteria in November 2024. In July 2026 ANAC opened consultation on updated criteria and published proposed noise criteria. That month Eve also applied to EASA for type certificate validation. It has been pursuing FAA validation since 2023. Six conforming prototypes will be used for the certification campaign. Components for the first have started to arrive, and Eve plans to begin assembly in early 2027, with a piloted flight in the second half of 2027.
In November 2026 Brazilian operator FlyBIS turned its 2022 letter of intent into a firm agreement for two aircraft plus rights for ten more, worth up to about US$60 million. Eve says its pre-order backlog is about 2,500 aircraft, valued at about US$12.6 billion.
Asia and Sri Lanka
In February 2026 Tokyo-based AirX placed a firm order for two aircraft with options for 48 more. Eve called this its first agreement in Asia-Pacific. The first deliveries are expected in 2029, for sightseeing and last-mile services in cities such as Tokyo and Osaka. In August 2026 Eve and Thailand's RV Connex signed a memorandum of understanding to help develop a regulatory framework for advanced air mobility in Thailand. No direct Sri Lanka link was found.
Milestones
- Dec 2025: Uncrewed full-scale engineering prototype made its first (hover) flight at Embraer's Gavião Peixoto test site, Brazil
- Feb 2026: Japan's AirX signed a firm order for two aircraft with options for 48 more; Eve's first Asia-Pacific agreement
- May 2026: Hover and low-speed test block completed after 59 flights; type certification and entry into service target moved from 2027 to 2028
- Jul 2026: ANAC opened consultation on updated Eve 100 airworthiness criteria and published proposed noise criteria; Eve applied to EASA for type certificate validation; transition flight-test phase began
- Aug 2026: First partial transition flight announced (3 Aug), with the pusher propeller engaged; stabilised speed of 27 kt
- Nov 2026: FlyBIS (Brazil) firm agreement for 2 aircraft plus rights for 10 more (up to about US$60M); Q3 results: 73 flights flown, 170 of 185 test points validated, partial transition up to 45 kt, components for the first conforming prototype arriving, first full transition planned before end-2026