At a glance
- Type
- aircraft developer
- Status
- development
- Headquarters
- Sacheon, South Gyeongsang Province, South Korea
- Last verified
- 2026-11
Overview
Korea Aerospace Industries (KAI) is South Korea's main aerospace and defence manufacturer. It was founded in 1999 and is based in Sacheon. KAI calls its advanced air mobility work "AAV" (advanced air vehicle) and lists it among its six future growth businesses. It covers both civil air taxis and military uses. Since 2022 KAI has been working on key technologies such as distributed electric propulsion, flight control and integrated airframe design. It is also developing its own demonstrator.
Aircraft
Development of the demonstrator formally started in January 2024. In March 2024 KAI's board approved KRW 55.3bn for phase 1 (2024–2025), covering basic and detailed design. In total, KAI plans to invest about KRW 150bn up to 2028. Phase 2 (2026–2028) covers building and flight-testing the aircraft. KAI's stated plan is then to seek Korean and US FAA certification and to commercialise the aircraft by 2031. In October 2024 KAI showed a 1:4-scale demonstrator for flight-control validation, along with a model of the aircraft (labelled E2X). Reports from 2025 said the first prototype was planned for the first half of 2027, with flight testing running to June 2028. No manufacturer specifications have been confirmed.
KAI also supplies aerostructures to other developers. In April 2024 it signed a contract to supply pylons for Eve Air Mobility's eVTOL.
Status
KAI's AAV programme is in development, and no full-scale flight has been reported. In mid-2025 Korean press reported that the programme's own budget was secured only until the end of that year. They also reported that the CEO who had championed it, Kang Goo-young, had stepped down early. KAI has kept the programme going. In 2026 it was building an AAV demonstration centre next to its rotorcraft flight centre, and it showed the AAV model at the 2026 Land & Transport Technology Fair in Seoul.
In early May 2026 KAI signed a memorandum of understanding (MoU) with Hyundai Motor Group in Seoul. The MoU was announced on 8–10 May. Under it, Hyundai's US-based affiliate Supernal and KAI will jointly develop a VTOL AAM aircraft. Supernal will lead design and engineering, and KAI will contribute its aircraft development experience. The partners will also work together on supply chains, certification, and commercialising Hyundai's electrified aviation powertrains. Supernal had paused development of its S-A2 in September 2025 and cut about 80% of its staff in February 2026. The partners plan a new next-generation design rather than reviving the S-A2.
In August 2025 the Korea AeroSpace Administration (KASA) announced a separate government AAV core-technology programme of about KRW 700bn over five years. In November 2026 KASA outlined a hybrid VTOL programme. Phase 1 runs from 2028 to 2032 with a budget of KRW 1.0861tn (including KRW 85.2bn of private money). It aims to build four five-seat-class prototypes and apply for certification. The plan still needs government review and approval. KAI and Hyundai have submitted letters of intent, but this does not mean they will take part or be selected.
Asia and Sri Lanka
KAI's AAV work is aimed mainly at the South Korean market, and it also links into national R&D programmes. No direct Sri Lanka link was found.
Milestones
- Jan 2024: KAI formally starts development of its AAV demonstrator
- Mar 2024: Board approves KRW 55.3bn for AAV phase 1 (2024–25), part of about KRW 150bn planned to 2028
- Apr 2024: Signs contract to supply pylons for Eve Air Mobility's eVTOL
- Oct 2024: Shows 1:4-scale AAV demonstrator and AAV model at FIX 2024, Daegu
- May 2026: Signs MoU with Hyundai Motor Group to co-develop an AAM aircraft with Supernal
- Nov 2026: Submits letter of intent, with Hyundai, for KASA hybrid VTOL programme