At a glance
- Type
- infrastructure / vertiports
- Status
- infrastructure / operator
- Headquarters
- Orlando, Florida, USA
- Last verified
- 2026-11
Overview
Signature Aviation runs what it calls the world's largest network of private aviation terminals (FBOs), with more than 200 locations in 27 countries. The company was listed on the London Stock Exchange until a consortium of Blackstone, Global Infrastructure Partners and Cascade Investment acquired it in 2021. The consortium paid about US$4.7 billion. Signature's advanced air mobility (AAM) work focuses on preparing its existing terminals for electric aircraft. It is not developing an aircraft of its own.
Aircraft
Signature does not build or operate aircraft. Its partnerships cover several developers:
- Archer: a June 2024 MoU to electrify Signature terminals for the Midnight aircraft.
- Eve Air Mobility: a December 2024 MoU to study eVTOL ground services.
- Wisk: an August 2025 MoU to plan vertiport sites for the autonomous Generation 6. The first project is at Ellington Airport in Houston, with Los Angeles and Miami also named.
- Electra: a July 2026 MoU, together with UrbanV, on access points for the EL9 hybrid-electric ultra-short take-off and landing aircraft.
Signature has also worked with Beta Technologies on charging since March 2024. Beta's chargers use the open Combined Charging System (CCS) standard, so other manufacturers' aircraft and ground electric vehicles can use them.
Status
The Beta partnership began in March 2024, when the first charger was commissioned at Signature's terminal at Manchester-Boston Regional Airport. In April 2026 Aviation Week reported that Signature had four Beta Charge Cubes operating at four sites:
- Manchester, New Hampshire
- Charlottesville, Virginia
- Frederick, Maryland
- Kissimmee, Florida
According to the report, these sites match early launch markets and the federal eVTOL Integration Pilot Program.
In May 2026 Signature, BETA, Republic Airways and its subsidiary Brickyard Connection completed three days of electric flight demonstrations at Kissimmee Gateway Airport. For the demonstrations, Signature commissioned a Charge Cube with a Thermal Management System for fast charging in hot, humid conditions. The campaign ended with an event on 18 May at Signature's hangar at Orlando International Airport.
Signature and the Italian vertiport developer UrbanV signed a joint-venture agreement in June 2025. They formally launched it as the Signature UrbanV Alliance (SUVA) at NBAA-BACE on 21 October 2026. SUVA will first operate from existing Signature terminals, providing charging, aircraft handling and passenger services. It plans to add purpose-built vertiports as demand grows and intends to serve several manufacturers and operators.
The agreements with aircraft developers are MoUs, and no commercial eVTOL passenger service from a Signature site was confirmed as of November 2026.
Asia and Sri Lanka
Signature describes its network as spanning five continents. No current Asia-specific AAM programme was found, and no direct Sri Lanka link was found.
Milestones
- Mar 2024: Partnership with BETA Technologies; first electric charger commissioned at Signature's Manchester-Boston Regional Airport FBO
- Jun 2024: MoU with Archer to electrify Signature's network of more than 200 terminals using Beta CCS chargers
- Dec 2024: MoU with Eve Air Mobility on eVTOL ground-operations requirements
- Jun 2025: Joint-venture agreement with UrbanV to develop US vertiport networks (Florida, New York, California, Texas)
- Aug 2025: MoU with Wisk on autonomous AAM infrastructure; first project at Ellington Airport, Houston
- May 2026: Electric flight demonstrations with BETA, Republic Airways and Brickyard Connection at Kissimmee Gateway Airport, where Signature commissioned a BETA Charge Cube with a Thermal Management System; closing event on 18 May at Signature's Orlando International hangar
- Jul 2026: MoU with Electra and UrbanV on infrastructure for EL9 ultra-short take-off and landing operations
- Oct 2026: Signature UrbanV Alliance (SUVA) formally launched at NBAA-BACE 2026 (21 Oct)