At a glance

Straight line
107.4 km
EHang EH216-S
78 min · beyond range
EHang VT35
36 min · in range
Joby S4
29 min · in range
Best months
Apr, Mar, Feb

At a glance

  • From: Teaching Hospital Batticaloa, inside the Batticaloa CTR.
  • To: District General Hospital Trincomalee, inside VCR17, the Trincomalee Harbour naval base restricted area.
  • Straight-line distance: 107.4 km.
  • Flight time: 29 to 36 minutes in the longer-range aircraft. The EH216-S does not have the range.
  • Best months for weather: April, March and February.
  • Worst months for weather: June, July and August.
  • Status: You cannot book an eVTOL flight in Sri Lanka. The first human-carrying flights took place at Port City on 11 November 2026, and about six months of testing is to follow. This page describes a possible corridor, not a service.

Distance and flight time

The two hospitals are 107.4 km apart in a straight line. The flight times below are the estimates in our data for each aircraft. They are longer than the straight-line distance at cruise speed alone.

Aircraft Cruise Flight time Usable range Within range with reserve?
EHang EH216-S 90 km/h 78 min 24 km No
EHang VT35 216 km/h 36 min 160 km Yes
Joby S4 280 km/h 29 min 129 km Yes

The EH216-S is the only one of these types to have flown in Sri Lanka. Its usable range of 24 km is far short of this corridor, so it could not fly the route. The VT35 is still going through CAAC type certification. The Joby S4 is flying as an FAA TIA-conforming aircraft, and a Dubai launch is targeted for late 2026. Our data records no Sri Lankan testing for either of these.

We have no road-time estimate for this corridor.

Airspace and protected areas

Both ends of the route are in controlled or restricted airspace. The straight line crosses:

  • Batticaloa CTR (control zone)
  • China Bay CTR (control zone)
  • VCR12, SLAF Base China Bay (restricted)
  • VCR17, Trincomalee Harbour naval base (restricted)

The Trincomalee hospital sits inside VCR17. Any flight there would need agreement from the authorities that control that area. The same applies to VCR12 and both control zones.

The route also crosses two protected areas:

  • Kayankerny MSAN
  • Seruvila - Allai

A real route might be planned to go around these areas, or flights over them might face extra conditions. Either way, they would need to be assessed.

Weather through the year

The flyability figures show the share of daylight hours (06:00 to 18:00) between 2015 and 2024 when ERA5 reanalysis data showed gusts, wind, rain or low cloud above planning thresholds. The thresholds are gusts of 13 m/s, wind of 10 m/s, rain of 2.5 mm/h and low cloud of 80%. These are planning assumptions, not aircraft limits. Each hour takes the worst conditions at either end of the route or at its midpoint.

The data shows two different patterns:

  • May to September: gusts. Gusts are the main problem in these months. They go above the threshold in 44.1% of daylight hours in June, 36.8% in July and 34.7% in August. June is the worst month overall, with 45.1% of hours affected and only 54.9% favourable.
  • October to January: rain and low cloud. Gusts drop away, but rain and low cloud rise. Rain is highest in November (7.1%). Low cloud is highest in December (12.6%) and January (11.4%). Between 15% and 18% of hours are affected from October to December.

March and April are the calmest months. April is the best, with only 2.3% of hours affected and 97.7% favourable. Steady wind above 10 m/s is rare all year. It never exceeds 1.0% of hours.

What has to happen first

Before anyone could fly this route:

  1. A suitable aircraft must be certified. The only type tested in Sri Lanka cannot fly this distance. The VT35 and Joby S4 have the range but are still in certification or testing.
  2. Testing in Sri Lanka must finish. About six months of testing is planned after the first crewed flights at Port City in November 2026.
  3. Regulators must allow flights beyond test flying. At present, testing is still under way.
  4. Airspace must be agreed. That means arrangements for two control zones and two military restricted areas, one of which contains the destination.
  5. Landing sites must be approved. A landing site would be needed at each hospital.
  6. The protected areas must be considered, either by routing around them or by setting conditions for flights over them.

Month by month

MonthFavourable daylight hoursNote
Jan87%12.8% of daylight hours affected, mostly by low cloud (11.4%). 87.2% favourable.
Feb90%9.8% of hours affected, mainly by low cloud. 90.2% favourable. One of the three best months.
Mar96%Calm. Only 4.1% of hours affected and 95.9% favourable. Second-best month.
Apr98%Best month. Only 2.3% of daylight hours affected and 97.7% favourable.
May77%Gusts rise sharply to 20.0% of hours. 23.2% affected in total and 76.8% favourable.
Jun55%Worst month. Gusts affect 44.1% of hours. 45.1% affected in total and only 54.9% favourable.
Jul61%Gusts remain high at 36.8%. 38.7% of hours affected and 61.3% favourable.
Aug63%Gusts affect 34.7% of hours. 36.7% affected in total and 63.3% favourable.
Sep67%Gusts ease to 29.8% and rain rises to 4.1%. 32.6% affected and 67.4% favourable.
Oct82%Gusts fall to 9.1% and rain rises to 5.6%. 17.5% affected and 82.5% favourable.
Nov85%Rain at its highest (7.1%) and low cloud 9.4%. 15.4% affected and 84.6% favourable.
Dec84%Low cloud at its highest (12.6%). 15.9% of hours affected and 84.1% favourable.