At a glance
- Straight line
- 80.3 km
- EHang EH216-S
- 60 min · beyond range
- EHang VT35
- 28 min · in range
- Joby S4
- 23 min · in range
- Best months
- Apr, Mar, Feb
At a glance
- Straight-line distance: 80.3 km.
- Modelled flight time: about 23 minutes (Joby S4) or 28 minutes (EHang VT35).
- EHang EH216-S: cannot fly this distance with a reserve. Its usable range is 24 km.
- Airspace: two control zones and two restricted areas. The Fort Frederick end lies inside restricted area VCR17.
- Protected areas crossed: six.
- Best months for weather: April, March and February. Worst: June, July and August.
This is a candidate corridor from the routes.evtol.lk planner. It is not a service. Members of the public cannot fly by eVTOL in Sri Lanka. The first aircraft arrived at BIA in October 2026, and the first human-carrying flights took place at Colombo Port City on 11 November 2026. You cannot book this trip.
Distance and flight time
The straight line from Habarana to Fort Frederick is 80.3 km. The flight times below are the planner's modelled figures. They are a few minutes longer than distance divided by cruise speed, so they appear to include an allowance beyond the cruise itself. A real flight could take longer again because of routing around controlled or restricted airspace.
| Aircraft | Cruise speed | Flight time | Within reserve range? |
|---|---|---|---|
| EHang EH216-S | 90 km/h | 60 min | No (usable range 24 km) |
| EHang VT35 | 216 km/h | 28 min | Yes (usable range 160 km) |
| Joby S4 | 280 km/h | 23 min | Yes (usable range 129 km) |
The EH216-S is the aircraft now being tested in Sri Lanka. Its usable range is less than a third of this distance, so it could not fly this corridor. The VT35 is still in CAAC type certification. FAA TIA-conforming Joby S4 aircraft are flying (as of March 2026), and its Dubai launch is targeted for late 2026.
The planner has no road time for this pair. Any road comparison would need its own estimate.
Airspace and protected areas
The straight line crosses:
- CTR-CHINABAY: China Bay control zone
- CTR-MINNERIYA: Minneriya (Hingurakgoda) control zone
- VCR12: SLAF Base China Bay (restricted)
- VCR17: Trincomalee Harbour naval base (restricted)
The Fort Frederick landing point is inside VCR17. Any flight would need clearance through both control zones and permission to enter both restricted areas. If that permission were not given, the landing site would have to move.
The line also passes over six protected areas: Aluthoya, Chundankadu, Hurulu Forest Reserve, Kaudulla, Somawatiya Chaithya and Talapathkanda. A real route might have to go around some of them or keep to a minimum height above them, which would make it longer.
Weather through the year
The flyability figures show the share of daylight hours (06:00–18:00) from 2015 to 2024 when ERA5 reanalysis data shows gusts, wind, heavy rain or low cloud above our planning thresholds. The thresholds are a 13 m/s gust, 10 m/s wind, 2.5 mm/h rain and 80% low cloud. They are planning assumptions, not aircraft limits. Each hour uses the worst reading from the two end points and the midpoint.
The data shows two clear seasons. From May to September, gusts are the main problem. The share of hours over the gust threshold rises from 30.6% in May to 66.9% in June, then falls to 49.2% in September. June is the worst month: 67.3% of daylight hours exceed a threshold. July (61.3%) and August (57.2%) are not much better.
From November to January, low cloud is the main problem, at 14.4% to 19.3% of hours. Rain peaks in November at 7.2%. October is a mix of both, with 24.3% of hours over a threshold.
March and April are the calmest months, with 6.6% and 3.9% of hours over a threshold. February is next at 15.4%.
What has to happen first
- A suitable aircraft. The only type in Sri Lanka lacks the range. The VT35 and Joby S4 have the range but are not yet certified for passenger service here.
- Testing. About six months of testing is planned after the first Port City flights in November 2026.
- Airspace access. Agreement is needed for the China Bay and Minneriya control zones and for restricted areas VCR12 and VCR17.
- A landing site. Fort Frederick lies inside the naval harbour restricted area. Either access is agreed there or another site is chosen.
- Protected areas. The route has to be planned around six protected areas.
- Mid-year weather. Between May and September, high gust levels would limit regular flying.
Month by month
| Month | Favourable daylight hours | Note |
|---|---|---|
| Jan | 80% | 20.3% of daylight hours over a threshold, mostly low cloud (19.3%). |
| Feb | 85% | 15.4% of hours over a threshold. Low cloud (14.6%) is the main factor. |
| Mar | 93% | One of the best months: 6.6% of hours over a threshold, mainly low cloud. |
| Apr | 96% | Best month: only 3.9% of daylight hours over any threshold. |
| May | 66% | Gusts arrive: 30.6% of hours over the gust threshold, 33.7% over any threshold. |
| Jun | 33% | Worst month: 67.3% of hours over a threshold, almost all from gusts (66.9%). |
| Jul | 39% | Still very gusty: 61.3% of daylight hours over a threshold. |
| Aug | 43% | 57.2% of hours over a threshold, mainly gusts (56.2%). |
| Sep | 50% | Gusts easing but still high: 50.4% of hours over a threshold. |
| Oct | 76% | Mixed month: 24.3% over a threshold, with gusts 17.1%, rain 6.5% and low cloud 5.0%. |
| Nov | 80% | 19.9% of hours over a threshold. Low cloud (14.4%) leads, and rain peaks at 7.2%. |
| Dec | 79% | 20.8% of hours over a threshold, mostly low cloud (17.9%). |