At a glance
- Straight line
- 155.5 km
- EHang EH216-S
- 110 min · beyond range
- EHang VT35
- 49 min · in range
- Joby S4
- 39 min · beyond range
- Best months
- Mar, Apr, Feb
At a glance
- From: Teaching Hospital Anuradhapura
- To: Teaching Hospital Jaffna
- Straight-line distance: 155.5 km
- Airspace crossed: Jaffna CTR; VCR11 SLAF Base Anuradhapura (restricted)
- Protected areas crossed: 10
- Best months for weather: March, April, February
- Worst months for weather: June, July, August
This is a candidate corridor from the routes.evtol.lk planner. It is not a service. eVTOL air travel is not open to the public in Sri Lanka. The first human-carrying eVTOL flights in Sri Lanka took place at Port City on 11 November 2026, and about six months of testing are to follow. You cannot book a flight on this route.
The planner has a corridor between these two hospitals because both may become national hospitals. Anuradhapura has been designated to become the fourth National Hospital after Rs 20 bn of works (May 2026). This has not yet been gazetted. An upgrade to national-hospital status for Jaffna was announced as expected in January 2026. It had not been gazetted as of October 2026.
The planner data has no road time for this pair. Road times in the planner are free-flow model estimates, and real journeys usually take longer.
Distance and flight time
The straight-line distance is 155.5 km. The table gives the planner's figures for three aircraft.
| Aircraft | Cruise | Flight time | Usable range | Within reserve range? |
|---|---|---|---|---|
| EHang EH216-S | 90 km/h | 110 min | 24 km | No |
| EHang VT35 | 216 km/h | 49 min | 160 km | Yes |
| Joby S4 | 280 km/h | 39 min | 129 km | No |
The EH216-S is the aircraft now being tested in Sri Lanka. Its usable range is far too short for this corridor. The Joby S4 is faster, but its usable range is less than the distance. Only the EHang VT35 is within reserve range, and its usable range is just 4.5 km more than the straight-line distance. The VT35 was unveiled in October 2025 and is still going through CAAC type certification.
Airspace and protected areas
The route starts inside VCR11, the restricted area around SLAF Base Anuradhapura. Any flight from this hospital would need permission to operate in that area. At the northern end, the route enters the Jaffna control zone (CTR), so it would need air traffic control coordination.
The straight line crosses 10 protected areas: Iranal Illuppalikulam, Kurukkalputukulam, Maduroad, Mandakalr, Mullikulam, Mundumurippu, Nagapaduwan, Neenthavil, Periyachipplkulam and Ponnaveli. A real flight path might have to go around some of them, or fly over them under conditions. Either could make the route longer.
Weather through the year
The flyability figures show the share of daylight hours (06:00–18:00) from 2015 to 2024 when ERA5 reanalysis data shows gusts, wind, heavy rain or low cloud above our planning thresholds. The thresholds are gusts of 13 m/s, wind of 10 m/s, rain of 2.5 mm/h and low cloud of 80%. They are planning assumptions, not aircraft limits. Each hour uses the worst reading from the two end-points and the midpoint.
March is the best month, with 97.5% of daylight hours favourable. April (96.1%) and February (93.2%) are close behind. From May to September, gusts are the main problem. In June, gusts are above the threshold in 52.8% of daylight hours, and only 46.0% of hours are favourable. July (54.3%) and August (56.7%) are only a little better. From October to January, gusts drop off, and rain and low cloud cause most of the lost hours. Favourable hours in those months range from 81.0% to 88.8%.
What has to happen first
- An aircraft would need certification and approval for use in Sri Lanka, with enough range to fly 155.5 km plus reserves.
- The testing at Port City would need to finish, and rules for passenger or medical services would need to be in place.
- Operators would need agreement for flights in VCR11 and procedures for the Jaffna CTR.
- The route would need to be planned around the protected areas, or approved over them.
- Both hospitals would need landing sites and charging.
- Services would need plans for the mid-year gust season.
Month by month
| Month | Favourable daylight hours | Note |
|---|---|---|
| Jan | 89% | 88.8% of daylight hours favourable. Low cloud is the main issue, above threshold in 10.2% of hours. |
| Feb | 93% | 93.2% favourable. Some low cloud (6.1% of hours). Gusts and rain are rare. |
| Mar | 98% | Best month: 97.5% favourable. Every factor stays low. |
| Apr | 96% | 96.1% favourable. Rain (2.2%) and low cloud (1.9%) are small and similar. |
| May | 70% | Gusts arrive: above threshold in 26.3% of hours. Only 70.5% of hours favourable. |
| Jun | 46% | Worst month: gusts above threshold in 52.8% of hours. Only 46.0% favourable. |
| Jul | 54% | Gusts above threshold in 43.9% of hours. 54.3% favourable. |
| Aug | 57% | Gusts above threshold in 40.6% of hours. 56.7% favourable. |
| Sep | 60% | Gusts still high at 36.5% of hours. 60.1% favourable. |
| Oct | 81% | 81.0% favourable. Gusts drop to 9.5%. Rain rises to 5.3% of hours. |
| Nov | 84% | 84.2% favourable. Rain (6.9%) and low cloud (9.8%) now cause most of the lost hours. |
| Dec | 86% | 85.8% favourable. Low cloud is above threshold in 11.5% of hours. |