Summary

The candidate point is inside prohibited area VCP7 (Parliamentary Complex, Kotte), which runs from ground level to FL300. It is also inside the Bellanwila - Attidiya Sanctuary. The 200 m land-cover cell at the point is classed as water, with surface water present 87% of the time. Each of these is a serious constraint. Together they block the site on current information.

The rest of the data is more favourable. The terrain is flat, winds are light and the surrounding catchment is large. Our judgement is that the demand case may justify looking for another site nearby, but not this point. Grade: D.

Location and catchment

The point is at 6.88832, 79.91874 in Colombo District, Western Province. Its elevation is 0 m.

Resident population (night-time):

  • 733 within 500 m
  • 57,151 within 2 km
  • 1,895,001 within 10 km

The city population figure is 107,925 (citypopulation.de). Night-light radiance is 9.0.

Distances from the point:

  • Port City Colombo: 10.0 km
  • Colombo Ratmalana airport: 8.2 km
  • Sri Jayewardenepura General Hospital: 2.4 km

OSM lists four health features within 3 km: an unnamed one at 995 m, Asiri Laboratory at 1,208 m, Hemas Hospital at 2,143 m and another unnamed one at 2,176 m. The nearest tourism node in the data is Negombo, 36.9 km away.

These figures count residents only. They do not show daytime workers or visitors.

Airspace

The point lies inside three volumes:

  • VCP7, Parliamentary Complex, Kotte: prohibited, GND–FL300.
  • VCR23, Colombo City Restricted Area: restricted, GND–FL245.
  • Colombo joint CTR (Katunayake + Ratmalana): GND–4000 ft.

Prohibited area VCP34 (Defence Headquarters Complex, Akuregoda) is 0.16 km away. VCP29 (Colombo City) is 4.94 km away.

Prohibited areas need a specific dispensation, and restricted areas need Air Force approval. The Port City sandbox shows that dispensations are possible. In our judgement, an area that protects the parliamentary complex is a much harder case. Any routing would also need to avoid VCP34.

Approach paths and terrain

Convention: headings are the direction the aircraft flies on departure. The approach is the reciprocal.

The terrain check sampled 16 headings out to 1,219 m. Every heading showed a minimum clearance of 12 m at 100 m. In other words, no terrain penetration was found on the 200 m model. Slope is 0.5° at the site, 1.0° on average within 500 m and at most 3.0°.

The check ignores buildings, trees, towers and power lines. Tree cover within 500 m is 47%, so these matter here. The Lotus Tower is 8.0 km away, beyond the end of the 1,219 m surface.

Notional paths are:

  • Primary: 225°. This faces into the SW monsoon, which blows from 223°.
  • Secondary: 020°. This faces into the NE monsoon, which blows from 11° (NNE on 48% of days). It is 205° from the primary.

Space and layout

EB 105A gives a Safety Area of about 38 m × 38 m (≈1,450 m²) for the largest Reference Aircraft. This excludes taxiways, parking, charging and the passenger area. A ministry figure gives under 900 m² per pad for a 2-seat EH216-S class vertiport.

The site cell is 4% built-up and classed as water. Within 500 m the mix is 47% tree cover, 36% water and 11% built-up. The data flags the point as on land, but this conflicts with the water class and the 87% water occurrence. A survey would need to resolve this.

The EB scope covers land-based aircraft only. A ground-level pad would also need:

  • a surface free of debris
  • drainage no steeper than 2:1
  • a safety barrier
  • a Downwash/Outwash Caution Area, which may extend 38.5 m or more from the TLOF centre

Wind and weather

The ERA5 statistics come from a point 2.1 km away (Water's Edge, Battaramulla). ERA5 grid spacing is about 25–30 km. It smooths out local effects such as sea breezes.

Season Wind from Steadiness Mean daily max wind Days with gust >15 m/s Days with >20 mm rain
SW monsoon (May–Sep) 223° 0.94 4.7 m/s 3.0% 8.5%
NE monsoon (Dec–Feb) 11° 0.66 3.5 m/s 0% 3.8%
Inter-monsoon (Mar–Apr) 211° 0.65 3.1 m/s 0% 4.1%
Inter-monsoon (Oct–Nov) 245° 0.33 3.5 m/s 1.0% 16.9%

No season showed gusts above 20 m/s. Monthly rainfall peaks at 415 mm in Oct–Nov.

Our judgement is that wind is not a constraint at desk level. Heavy rain in Oct–Nov would reduce the number of VFR operating days.

Environment and neighbours

The point is inside the Bellanwila - Attidiya Sanctuary. Bolgoda EPA is 6.58 km away. The mix of water and tree cover suggests wetland habitat. This is our inference, not a surveyed finding.

OSM shows no schools or places of worship within 500 m. However, OSM completeness varies, and absence in OSM does not mean absence on the ground. There are five heritage features within 1 km, including:

  • an unnamed memorial at 481 m
  • the Indian Peace Keeping Force (1987-2000) memorial at 528 m
  • the War Heroes Monument at 592 m

The 733 residents within 500 m would be exposed to noise and outwash.

What would need to be checked

  • Whether CAASL and the Air Force would consider any use of VCP7. If not, the site is closed.
  • Whether there is an alternative land-based site nearby, outside VCP7, VCP34 and the sanctuary.
  • What the sanctuary designation permits, and the wildlife authority's position.
  • Whether the exact point is open water, seasonal wetland or dry ground.
  • Obstacle heights (buildings, trees, masts, lines) along 225° and 020°.
  • How operations would interact with Ratmalana procedures.
  • Bird activity over the wetland.
  • Local wind measurements to replace the ERA5 estimates.

This is a desk-based planning screen using open data, not an approval, survey or design.

Scorecard

CriterionRatingEvidence
Demand and catchment3/557,151 residents within 2 km and 1,895,001 within 10 km, but only 733 within 500 m. The city population figure is 107,925 (citypopulation.de).
Airspace1/5Inside prohibited area VCP7 (GND–FL300), restricted area VCR23 (GND–FL245) and the Colombo joint CTR (GND–4000 ft). Prohibited area VCP34 is 0.16 km away.
Terrain and approach paths4/5No terrain penetration found on the 200 m model on any of the 16 headings. Minimum clearance is 12 m at 100 m on every heading. Slope is 0.5° at the site and at most 3.0° within 500 m. Trees (47% cover within 500 m) and buildings are not modelled.
Footprint and land1/5The land cover at the site is classed as water, with 87% water occurrence. Within 500 m the mix is 36% water, 47% tree cover and 11% built-up. The EB 105A scope is land-based only.
Wind and weather4/5In the SW monsoon the wind blows from 223° with steadiness 0.94. The mean daily maximum is 4.7 m/s, with gusts above 15 m/s on 3.0% of days. Oct–Nov is the wettest period: 415 mm/month and 16.9% of days with more than 20 mm of rain.
Environment and protected areas1/5Inside the Bellanwila - Attidiya Sanctuary (0.0 km). Bolgoda EPA is 6.58 km away.
Noise and neighbours3/5733 residents within 500 m. OSM shows no schools or places of worship within 500 m, but OSM is incomplete. Memorials are at 481 m and 528 m, and the War Heroes Monument is at 592 m.
Connectivity and emergency value3/5Sri Jayewardenepura General Hospital is 2.4 km away. OSM lists four health features within 3 km, the nearest at 995 m. Port City is 10.0 km away and Ratmalana 8.2 km.

Key risks

  • Inside prohibited area VCP7 (Parliamentary Complex, Kotte), from ground to FL300. Prohibited areas need a specific dispensation.
  • Inside restricted area VCR23 and the Colombo joint CTR. Prohibited area VCP34 is 0.16 km away.
  • Inside the Bellanwila - Attidiya Sanctuary. Wildlife clearance would be needed.
  • The site cell is classed as water (87% water occurrence). The EB 105A reference aircraft is land-based only.
  • 47% tree cover within 500 m is not captured by the terrain-only 8:1 check.
  • Oct–Nov rainfall of 415 mm/month, with more than 20 mm of rain on 16.9% of days, would limit VFR operations.

Open questions

  • Would CAASL and the Air Force consider any dispensation for flights inside VCP7, or is the area closed to this use?
  • Is the exact point open water, seasonal wetland or dry land? The data flags it as on land but classes the land cover as water, with 87% water occurrence.
  • What does the sanctuary designation allow? Would the wildlife authority permit any construction or flights?
  • Is there a land-based site nearby that is outside VCP7, VCP34 and the sanctuary, and what would it be graded?
  • What heights do the buildings, trees, masts and power lines on the 225° and 020° paths reach?
  • How would operations here interact with traffic and procedures at Ratmalana, 8.2 km away?
  • What is the level of bird activity over the wetland, and what strike risk does it pose?
  • What do local wind measurements show, given that ERA5 data comes from a point 2.1 km away on a 25–30 km grid?

Desk-based planning screen using open data (routes.evtol.lk planner layers, OpenStreetMap, ERA5 2015–2024) and the FAA Engineering Brief 105A as a design reference. It is not a survey, design or approval; Sri Lanka has not published a vertiport standard. Drafted with an AI model constrained to the data, then independently fact-checked.